How Long Does a Dropped Kerb Installation Take?

A dropped kerb installation is a popular way to create vehicle access from the road to your property, making parking...

How Long Does a Dropped Kerb Installation Take?

A dropped kerb installation is a popular way to create vehicle access from the road to your property, making parking easier and improving convenience. Whether you’re planning a new driveway or modifying an existing one, understanding the timeline of a dropped kerb installation in Washington is important for planning and managing expectations.

What Is a Dropped Kerb?

A dropped kerb involves lowering the pavement edge and kerb stones so vehicles can drive smoothly between the road and your driveway or garden. It often requires removing existing kerbs, excavating the pavement, and laying a suitable surface for access. Before any work begins, you usually need to get permission or a licence from your local council or highway authority. This ensures the installation meets safety standards and legal requirements.

Typical Duration of a Dropped Kerb Installation

The time it takes to install a dropped kerb can vary depending on several factors, but on average:

  • Standard installations take between 1 to 3 days.

Here’s a breakdown of the typical timeline:

Day 1: Site Preparation and Excavation

The first day generally involves setting out the area, marking the kerb boundaries, and removing the existing kerb stones and pavement section. Excavation equipment may be used to remove soil and prepare the base.

Day 2: Installing the New Kerb and Surface

Once the base is prepared, new kerb stones are laid at a lower level, and the surface is finished, usually with tarmac or concrete. Proper leveling and alignment are essential to ensure a smooth vehicle entry.

Day 3: Finishing Touches and Curing

The final day is often for any finishing touches, like Driveways cleaning the site and allowing time for materials (especially concrete) to cure and harden. Depending on weather and material type, curing can take longer but usually doesn’t prevent vehicle use after a few hours.

Factors That Affect Installation Time

Several factors can influence how long your dropped kerb installation takes:

1. Permission and Approvals

Obtaining permission or a licence from the local authority can sometimes take weeks or months before work starts, though this doesn’t affect the actual installation duration once approved.

2. Site Conditions

If the site has complicated features such as underground utilities (water pipes, gas lines), tree roots, or uneven ground, additional work might be needed, extending the installation time.

3. Size and Complexity

Longer or wider dropped kerbs require more excavation and materials, potentially adding days to the process.

4. Weather

Heavy rain or extreme weather conditions can delay construction or curing times.

5. Contractor Availability

Scheduling with your chosen installer can also impact timing, especially during busy seasons.

Can I Use the Driveway During Installation?

During the excavation and installation phases, vehicle access will usually be restricted for safety reasons. After the kerb and surface are laid and sufficiently cured, you can generally resume normal use. Your contractor or local council can provide specific guidance on when it’s safe to drive over the new dropped kerb.

Why Choose Professional Installation?

Dropped kerb installations must comply with local regulations and safety standards. Professional installers like Driveways Washington ensure:

  • Proper permissions are obtained.
  • Safe, compliant construction.
  • Efficient and timely work.
  • Quality materials and finishes.

Choosing an experienced installer reduces risks and can save you time and hassle.

Conclusion

A typical dropped kerb installation usually takes between one and three days, depending on the project’s size, site conditions, and weather. While the actual installation is relatively quick, planning and permissions can take longer. If you’re considering a dropped kerb for your property, it’s wise to consult professionals like Driveways Washington to ensure a smooth and compliant process.